|
|
|
|
|
|
|
|
|
Education |
· University
of Victoria, Victoria, BC. Master's in
applied science; graduated in 2005.
· University
of Victoria, Victoria, BC. Completed Bachelor in Mechanical Engineering;
graduated in 2002.
· University
of Pisa, Pisa Italy. Completed 1st, 2nd, 3rd year, and attended
4A term of Mechanical Engineering (1991-1994).
· Liceo
Classico Galileo Galilei, Pisa, Italy. Graduated from 5 years
of Classics studies in 1991.
· Liceo
Classico Pilo Albertelli, Roma, Italy. Completed four years of
Classics studies (1986-1990).
|
|
|
|
|
|
|
Awards |
·1st
place for first annual NHA (National Hydrogen Association) student
design competition
·3rd
place for senior design WECC 2002 (Western Engineering Conference
Competition)
· Math
200s best student for the year 1996 at North Island College
in Courtenay.
|
|
|
|
|
|
Mechanical
Desktop/AutoCAD,SolidWorks, Cosmos/Works, Dynamic Designer, Flow/Works,
Pro-Engineer, Ansys, MathCad, MatLab, FEMLab, Labview, Simply Accounting,
Office, Access, Power Point, Visio, Front Page, Dreamwaver, MS Projects,
Corel Suite, Photoshop, PhotoImpact, Bryce. |
|
|
|
|
Cryogenics,
Lab Associate
|
September
2002-August 2007
|
| University
of Victoria, Engineering Department
www.ensys.ca |
Victoria,
BC |
|
· Upgraded
magnetic refrigeration test apparatus.
· Carried
out optimization experiments for active magnetic regenerators.
· Upgraded
lab superconducting magnet now rated for higher magnetic fields
( up to 3 Tesla).
· Programmed
the data acquisition system of the experimental apparatus using
Labview.
· Simulated
thermal and magnetic properties using FEMLab.
· Designed and built a magnetic refrigerator prototype.
|
Formula
SAE Project Co-Leader
|
|
| University
of Victoria, Engineering Department
UVic
SAE Team |
Victoria,
BC |
|
· Leader
of the chassis design and construction.
· Leader
of body design.
· Designed
frame, suspensions, steering and conceptual body of the race car.
· Generated
an accurate 3D model of the chassis with SolidWorks. The assembly
includes almost 1000 components.
· Simulated
a dynamic motion of the suspension of the model with ADAMS/View.
· Simulated
a flow envelope of the body for a drag/downforce estimate with
Flow/Works.
· Design
optimization with FEA
|
|
|
Cad
Draftsman - Maintenance Engineering Assistant
|
May
2000-August 2000 |
| Fletcher
Challenge Crofton Pulp & Paper |
Crofton,
BC |
· Designed
solutions for a variety of structural improvements.
· Analyzed
and compared the performance of several vibration analysis techniques
for slow turning speeds.
· Optimized,
wrote, organized and standardized procedures for the routine maintenance
of large pieces of equipment.
· Designed
and programmed an Access database storing and organizing all the
projects.
|
|
|
|
|
|
TMP
Lubrication Maintenance Planner
|
September
1999-April 1999
|
| Fletcher
Challenge Elk Falls Pulp & Paper |
Campbell
River, BC |
· Implemented
the software Lube It for the lubrication maintenance
of the Thermomechanical plant. The objective of the project was
the computerization of the scheduling process of hundreds of lubrication
tasks of half billion dollars plant.
· Designed
and programmed an Access database complementing Lube It.
· Trained
the TMP technicians to use the software.
|
|
|
|
|
|
CAD
draftsman
|
September
1998-April 1999 |
| Fletcher
Challenge Elk Falls Pulp & Paper |
Campbell
River, BC |
· Generated
a database of mechanical drawings with AutoCad 13, for the engineering
maintenance department and machine shop. The database included
over one hundred drawings of part details and assembly.
· Designed
parts to adapt a superfinisher tool worth $ 40,000 to work with
a roll grinder machine worth $ 2 million. The project involved
several detail and assembly drawings and a 3D model all generated
with AutoCad.
|
|
|
|
|
|
Director
of Sales and Distribution
|
July
1997-June 2001 |
| Alta
I.D. enterprises ltd |
Courtenay,
BC |
· Administrated
sales and distribution of imported food for the lower Vancouver
Island market, with the support of Simply Accounting and Office
97.
· Designed
a customer manager database. The database features
customer information, product information, price lists, and sales
history.
|
|
|
|
|
|
Head technician
of Fresh Pasta Machines
|
December
1995-August 1997 |
| Pasta
Art Restaurant & Deli |
Courtenay,
BC |
Designed and
administered recipes and process for a 200kg/day production line.
· Operated
$200,000 worth of machinery for two years, with complete responsibility
of the equipment. Quality and consistency of the service have
always been fully satisfactory for restaurant and deli customers.
· Managed
maintenance and repairs of the machinery. I have been in charge
of lubricating, cleaning, inspecting the machines, and fixing
or replacing worn out or damaged parts.
|
|
|
Revised May 27, 2005 |
|
|
|